Jack Ganssle has a nice design article that details a long history of design errors, from bridge building to safety critical software problems. Much of it is about NASA mission failures, but he also checks in on the topics of radiation therapy, pacemakers, and nuclear experiments. Good one-stop shopping for horror stories and a discussion of high level patterns behind these sorts of problems.
On discussing the Therac 25:
"The FDA found the usual four horsemen of the software apocalypse at fault: inadequate testing, poor requirements, no code inspections, and no use of a defined software process."
Quote of the day from the article:
"Globals are responsible for all of the evil in the universe, from male pattern baldness to ozone depletion."
Source: Mars Ate My Spacecraft
Companion blog to the book Better Embedded System Software by Phil Koopman at Carnegie Mellon University
Wednesday, April 27, 2011
Monday, April 18, 2011
Peer Reviews are Cheap
In previous posts I've talked about how useful peer reviews can be. But some many folks say they are just too expensive. That just isn't so. Here's the math.
You can write good embedded software at the rate of 1-2 lines of code per hour. (That is all source lines of code divided by all hours for a project, including requirements, test, etc. Really, that is the number.)
Formal, rigorous, thorough peer reviews target 100-200 lines of code reviewed per hour (we're talking Fagan style inspections, which are quite formal, but still the most cost effective review method from all the data I've seen). Let's say you have 4 people in an inspection. That is 25-50 lines of code per person-hour. If you include an hour of prep time for each person for a two-hour review, that is still 17-33 lines of code per person-hour.
Think you write code faster? OK, let's say you're Agile and do 3 lines of code/hr (what I've seen in industry, and comes with increased risk we can discuss elsewhere). That's still nowhere near the review productivity rate.
We're talking maybe 5%-10% of project effort to do heavy-weight reviews. And it generally finds half the bugs. More importantly, it finds them early, so you don't have a lot of rework.
So why does everyone say it is too expensive?
You can write good embedded software at the rate of 1-2 lines of code per hour. (That is all source lines of code divided by all hours for a project, including requirements, test, etc. Really, that is the number.)
Formal, rigorous, thorough peer reviews target 100-200 lines of code reviewed per hour (we're talking Fagan style inspections, which are quite formal, but still the most cost effective review method from all the data I've seen). Let's say you have 4 people in an inspection. That is 25-50 lines of code per person-hour. If you include an hour of prep time for each person for a two-hour review, that is still 17-33 lines of code per person-hour.
Think you write code faster? OK, let's say you're Agile and do 3 lines of code/hr (what I've seen in industry, and comes with increased risk we can discuss elsewhere). That's still nowhere near the review productivity rate.
We're talking maybe 5%-10% of project effort to do heavy-weight reviews. And it generally finds half the bugs. More importantly, it finds them early, so you don't have a lot of rework.
So why does everyone say it is too expensive?
Thursday, March 31, 2011
Good Article on User Interface Design Rules
I found a well-written article about user interface design rules. "Understanding user interface design rules," by Jeff Johnson, EE Times. (Two part article links: Part 1 | Part 2 )
The take-aways are:
This article is well worth the time for anyone who designs embedded systems.
The take-aways are:
- Make the operation task-focused, simple, and consistent. Bring the operation itself as close to possible as what the user wants to accomplish (the outcome), not what the device knows how to do (the mechanisms available).
- Keep things simplicity and consistent.
- Make the terminology familiar (and task-focused, and simple). Use the meaning that people expect to see, not jargon. Use different terms whenever there is a concept that differs in an important way. Don't use different terms if the difference doesn't matter to the user.
- Make mistakes low cost (e.g., provide undo) so people aren't afraid to explore the interface.
This article is well worth the time for anyone who designs embedded systems.
Thursday, March 24, 2011
Using a Risk Analysis Table to Categorize Bug Priority
Perhaps the single most difficult thing to get right in a bug report is assigning a priority. It is tempting to assign a priority based on how spectacular the result is. But you also need to take into account how likely the bug is to manifest in a deployed system. For example, a bug that causes a system to crash and automatically reboot may be a lot more dramatic than a confusing screen message, but if that confusing screen message results in thousands of tech support calls, it could be a disaster for your company. The best approach is one that combines severity and probability.
It is tempting to try to use fancy math to combine severity and probability. Usually that doesn't work out so well in practice. Instead, I recommend borrowing a technique from the safety critical system community. They use a Risk Table to assign a "criticality" to a particular adverse event as part of their Preliminary Hazard Analysis (PHA). You can use the same table in a different way and just say you are assigning bug "priority" instead of "risk." Below is an example Risk Table:
Probability is your best estimate as to how often the bug will be seen in use. Consequence is how big a problem it will cause. The Risk (indicated by each box in the grid) is how big the risk is to product reputation -- which ought to be the same as the bug priority. It helps to have clearly defined statements to guide assigning any particular bug to a row and to a column. Once you assign probability and consequence, the table tells you the priority of that particular bug.
You can modify this table to have 3 to 6 rows and 3 to 6 columns depending upon your needs (the table can be a rectangle rather than a square). You can also modify the asymmetry of assigning risks as has been done in this example (consequence is weighted a bit higher than probability for this table by putting extra "Very High" boxes on the top row and so on). The point is not the table itself, but rather that binning things in this way makes assigning bug priority a lot easier for people to do in practice.
It is tempting to try to use fancy math to combine severity and probability. Usually that doesn't work out so well in practice. Instead, I recommend borrowing a technique from the safety critical system community. They use a Risk Table to assign a "criticality" to a particular adverse event as part of their Preliminary Hazard Analysis (PHA). You can use the same table in a different way and just say you are assigning bug "priority" instead of "risk." Below is an example Risk Table:
Probability is your best estimate as to how often the bug will be seen in use. Consequence is how big a problem it will cause. The Risk (indicated by each box in the grid) is how big the risk is to product reputation -- which ought to be the same as the bug priority. It helps to have clearly defined statements to guide assigning any particular bug to a row and to a column. Once you assign probability and consequence, the table tells you the priority of that particular bug.
You can modify this table to have 3 to 6 rows and 3 to 6 columns depending upon your needs (the table can be a rectangle rather than a square). You can also modify the asymmetry of assigning risks as has been done in this example (consequence is weighted a bit higher than probability for this table by putting extra "Very High" boxes on the top row and so on). The point is not the table itself, but rather that binning things in this way makes assigning bug priority a lot easier for people to do in practice.
Monday, February 21, 2011
Categorizing Bug Severity
One of the imponderables when using a bug tracking system such as Bugzilla is how to assign "severity" to a particular defect entry. It is instinctive to assign severity based on how dramatic the outcome is. So in that sort of system an LED that sometimes doesn't blink might be "medium" and "low" and a system crash might be "critical." BUT, that's usually not the best way to look at severity.
Instead defect severity should be based on how urgent it is to get fixed for the business environment your product lives in. To use the above example, what if the non-blinking LED causes 1000 field support visits calls because people think the device isn't working properly (perhaps it is a cable modem and "blinking" means "I'm working properly")? What if the system crash is likely to happen to only one out of every 100,000 customers, and happens in a situation in which the customer is very likely just to cycle power to clear the problem without any big deal? In that situation the first defect might be "critical" and the second might only be "medium" severity.
So when you are thinking about assigning issue severity, consider the business context and not just how the defect feels to a tester or developer at a test bench. The general idea is that defect severity should correspond to value to the business of fixing the defect, and not how embarrassing it might be to the developers. (You can read more about good practices for defect tracking in chapter 24 of my book.)
Instead defect severity should be based on how urgent it is to get fixed for the business environment your product lives in. To use the above example, what if the non-blinking LED causes 1000 field support visits calls because people think the device isn't working properly (perhaps it is a cable modem and "blinking" means "I'm working properly")? What if the system crash is likely to happen to only one out of every 100,000 customers, and happens in a situation in which the customer is very likely just to cycle power to clear the problem without any big deal? In that situation the first defect might be "critical" and the second might only be "medium" severity.
So when you are thinking about assigning issue severity, consider the business context and not just how the defect feels to a tester or developer at a test bench. The general idea is that defect severity should correspond to value to the business of fixing the defect, and not how embarrassing it might be to the developers. (You can read more about good practices for defect tracking in chapter 24 of my book.)
Monday, January 24, 2011
Peer Reviews and the 50/50 Rule
Surprisingly, there is a fairly easy way to know if your peer reviews are effective. They should be finding about 50% of your defects, and testing should be finding the other 50%. In other words the 50/50 rule for peer reviews is they should find half the defects you find before shipping the product. If peer reviews aren't finding that many defects, something is wrong.
I base this rule of thumb on some study data and my observations of a number of real projects. If you want to find out if teams are really doing peer reviews (and doing ones that are effective), just ask what fraction of defects are found in peer reviews. If you get an answer in the 40%-60% range probably they're doing well. If you get a lower answer than 40%, peer reviews are being skipped or are being done ineffectively. If they answer is "we do them but don't log them" then most of the time they are being done ineffectively, but you need to dig deeper to find out what is going on.
If you are trying to find all your defects in test (instead of letting peer review get half of them for you), you are taking some big risks. Test is usually a more expensive way to find defects. More importantly, peer review tends to find many defects or poor design choices that are difficult to find by testing with any reasonable effort.
So, why make your testing expensive and your product more bug prone? Try some peer reviews and see what they find.
I base this rule of thumb on some study data and my observations of a number of real projects. If you want to find out if teams are really doing peer reviews (and doing ones that are effective), just ask what fraction of defects are found in peer reviews. If you get an answer in the 40%-60% range probably they're doing well. If you get a lower answer than 40%, peer reviews are being skipped or are being done ineffectively. If they answer is "we do them but don't log them" then most of the time they are being done ineffectively, but you need to dig deeper to find out what is going on.
If you are trying to find all your defects in test (instead of letting peer review get half of them for you), you are taking some big risks. Test is usually a more expensive way to find defects. More importantly, peer review tends to find many defects or poor design choices that are difficult to find by testing with any reasonable effort.
So, why make your testing expensive and your product more bug prone? Try some peer reviews and see what they find.
Thursday, January 13, 2011
Embedded Software Risk Areas -- Five Forbodes Failure
Series Intro: this is one of a series of posts summarizing the different red flag areas I've encountered in more than a decade of doing design reviews of industry embedded system software projects. You can read more about the study here. The results of this study inspired the chapters in my book.
To conclude these series of postings, here is an observation to ponder.
To conclude these series of postings, here is an observation to ponder.
One of the informal observations made across the course of these reviews was that developer teams with exactly 5 primary contributors have the most spectacular project failures. Invariably these teams had previously completed a project with 3 or 4 members successfully, and increased the team size to tackle a more complex project without making any changes in their software process. But they failed with the new, 5-person team.
While this is an anecdotal result, projects that grow past 4 developers in size should seriously consider switching to a heavier weight software process (more paper, more formality, more methodical rigor). Smaller teams still seem to benefit from good process, but basically can get away with informality with less dramatic risks than larger teams (5 or more developers) working on more complex projects.
Does this mean with fewer than 5 people you can simply ignore all the risk areas I've posted? No. Most of the reviews (perhaps 80%) were conducted on teams with fewer than 5 people. What this does mean is that with only one or a few developers you can get away with a lot and only have a few red flag risk areas. If you are lucky you will survive them, and if you are unlucky they will bite you. Hard. But most of the time you will slide by well enough that you will work nights, weekends, and have no social life -- but you will still have a job.
But, if you have more than 5 people you probably have to do most or even all of the process activities listed in these risk areas. If you blow off using a rigorous process, it is pretty likely you will fail. Probably you will fail spectacularly.
At least this is what I have observed doing 95 reviews over 10 years in industry. Your mileage may vary.
Does this mean with fewer than 5 people you can simply ignore all the risk areas I've posted? No. Most of the reviews (perhaps 80%) were conducted on teams with fewer than 5 people. What this does mean is that with only one or a few developers you can get away with a lot and only have a few red flag risk areas. If you are lucky you will survive them, and if you are unlucky they will bite you. Hard. But most of the time you will slide by well enough that you will work nights, weekends, and have no social life -- but you will still have a job.
But, if you have more than 5 people you probably have to do most or even all of the process activities listed in these risk areas. If you blow off using a rigorous process, it is pretty likely you will fail. Probably you will fail spectacularly.
At least this is what I have observed doing 95 reviews over 10 years in industry. Your mileage may vary.
Subscribe to:
Posts (Atom)
Static Analysis Ranked Defect List
Crazy idea of the day: Static Analysis Ranked Defect List. Here is a software analysis tool feature request/product idea: So many times we...
-
(If you want to know more, see my Webinar on CRCs and checksums based on work sponsored by the FAA.) If you are looking for a lightwei...
-
I recently worked with some embedded system teams who were struggling with the best way to use .c and .h files for their source code. As I w...
-
If you want to estimate how long it's going to take to create a piece of embedded software (and how much it will cost), it's useful ...